Jump to content

New MH/SB/Charlie pack build.


Rolf
 Share

Recommended Posts

hooooo I was afraid when I saw the first picture :lol:

........but the next is just perfect. the weathering effect is really Successful :) .

nice work on it.

Ha ha good one bro :lol:

My new sandtrooper suit, have been done for about a week or so.

Hope to take some pictures of all the gear on this week.

Thanks for all your kind replys, i´m happy your like the pack.

I try to get better every time.

Cheers bro´s :)

Link to comment
Share on other sites

  • 4 weeks later...

Hi Rolf,

Like to know how did you put these parts together on your MH/SB Backpack (yes I'll be embarking on mine in due time after the rest of my parts have reached me safely ;) ) :

1. Mortar Tube

Any pics to show how you assembled this to right side of your Backpack Seed Trays / Frame?

Also what is the exact lenght in Inches/cm of your "Mortar" Tube before adding the End Caps?

2. Exhaust Port

Any pics taken when you assembled this part? :)

3. Backpack Straps

What are the materials did you use and how did you attach them to your Backpack frame?

Thanks bro :)

Link to comment
Share on other sites

Hi Rolf,

Like to know how did you put these parts together on your MH/SB Backpack (yes I'll be embarking on mine in due time after the rest of my parts have reached me safely ;) ) :

1. Mortar Tube

Any pics to show how you assembled this to right side of your Backpack Seed Trays / Frame?

Also what is the exact lenght in Inches/cm of your "Mortar" Tube before adding the End Caps?

2. Exhaust Port

Any pics taken when you assembled this part? :)

3. Backpack Straps

What are the materials did you use and how did you attach them to your Backpack frame?

Thanks bro :)

1). Its just about 70 cm.

I add all my parts on whit black plastic strips, no screws.

Its solid and light, and make no noice + don´t pop off like screws can do.

I just drill two holes in the motar tube top, and two in the bottom (around 10 cm in, both times. There are only around 1 cm between the two holes).

I then drill the same holes direct in the back seed trays, and now i just add it on whit a strip in the top and bottem.

And it stays there for good.

Posted Image

2). No sadly, i have no pictures of it.

I add all my parts on whit strips, seed trays to the frame.

Siphon, radio, upper box etc.

I used hopt glue to assemble the upper big box, and small box.

And i use E6000 for the smaller things, like the walls on the small box.

(shells are add on whit hot glue)

Posted Image

3). Here you can see the black elastics, add on whit strips to the pvc frame.

Posted Image

Posted Image

Posted Image

Cheers bro :)

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...